# Kansas City Landfill Capacity: Supporting Research and Methodology

Analysis prepared by Dump It KC, November 15, 2026. This report explains the calculations behind “How Much Landfill Space Does Kansas City Have Left?” and distinguishes historical modeling from newer facility records.

## What the analysis measures

We compared the annual filling and remaining capacity of seven existing facilities listed in Table 1 of MARC’s January 2024 Regional Landfill Capacity Study. Annual filling reflects the 2020–2022 average, while the capacity column is labeled December 31, 2021; these dates are preserved rather than presented as current measurements. ([MARC study](https://www.marc.org/document/landfill-capacity-study))

The seven facilities are HAMM, Johnson County, Rolling Meadows, Central Missouri, Courtney Ridge, Show Me Regional and St. Joseph. Proposed Presidio is excluded from the denominator because its capacity was marked as proposed in that baseline. ([MARC Table 1](https://www.marc.org/document/landfill-capacity-study))

## Original calculations

The seven rows total 4,697,660 cubic yards of annual filling and 132,802,884 cubic yards of remaining capacity. Johnson County, Central Missouri and Courtney Ridge together account for 3,176,034 cubic yards of annual filling and 52,541,129 cubic yards of remaining capacity. ([calculated from MARC Table 1](https://www.marc.org/document/landfill-capacity-study))

We divided each facility or group’s annual filling by the filling total and its remaining capacity by the capacity total. For those three facilities, the results are 67.608852% of filling and 39.563244% of capacity, a difference of 28.045608 percentage points. ([calculated from MARC Table 1](https://www.marc.org/document/landfill-capacity-study))

```text
Fill share (%) = facility or group annual filling / 4,697,660 × 100
Capacity share (%) = facility or group remaining capacity / 132,802,884 × 100
Share difference = fill share − capacity share
```

HAMM’s corresponding shares are 16.111319% of filling and 41.008859% of remaining space. The article rounds values for readability, while the baseline CSV retains six decimal places for percentages. ([calculated from MARC Table 1](https://www.marc.org/document/landfill-capacity-study))

These are shares of facility throughput, not shares of waste generated by Kansas City residents or businesses. Private landfills may receive waste from outside the region, and the comparison does not establish an actual closing date or future hauling price. ([MARC study assumptions](https://www.marc.org/document/landfill-capacity-study))

## Model comparisons

MARC Table 3 reports scenario years as of December 31, 2022, not the research date. The 19.7-to-37.5-year range corresponds to different assumptions and is not a new countdown from 2026. ([MARC Table 3](https://www.marc.org/document/landfill-capacity-study))

| Comparison | One modeled assumption changed | Difference in modeled life |
|---|---|---:|
| Scenarios 2 to 11 | Add 1.81% annual per-capita waste growth | −3.9 years ([MARC](https://www.marc.org/document/landfill-capacity-study)) |
| Scenarios 2 to 4 | Add 20 million cubic yards of expansion | +3.8 years ([MARC](https://www.marc.org/document/landfill-capacity-study)) |
| Scenarios 7 to 8 | Add 10% additional diversion | +3.1 years ([MARC](https://www.marc.org/document/landfill-capacity-study)) |
| Scenarios 7 to 9 | Add 20% additional diversion | +6.9 years ([MARC](https://www.marc.org/document/landfill-capacity-study)) |
| Scenarios 5 to 10 | Add 10% additional diversion in the population-plus-Presidio case | +2.8 years ([MARC](https://www.marc.org/document/landfill-capacity-study)) |

These are arithmetic differences between published model outputs, not a new engineering simulation. MARC assumes waste is redirected after closures and does not impose maximum annual acceptance constraints, so its endpoint cannot establish how actual rerouting will affect operations. ([MARC study assumptions](https://www.marc.org/document/landfill-capacity-study))

The four facilities assigned final acceptance years at or before 2037 in Scenario 2 account for 71.466688% of baseline filling. That percentage describes throughput associated with those modeled facilities, not a forecast loss of that percentage of regional capacity. ([calculated from MARC Tables 1 and 4](https://www.marc.org/document/landfill-capacity-study))

## Later records are a separate dataset

Kansas’ 2026–2030 state plan reports figures from the 2023–2024 permit-renewal period. Missouri’s 2026 airspace presentation includes 2025 survey dates, even though its facility table is headed “Airspace Table 2024 Update.” ([KDHE Table 2-2](https://www.kdhe.ks.gov/DocumentCenter/View/60241/State-Solid-Waste-Management-Plan-2026-2030-PDF); [Missouri DNR presentation](https://dnr.mo.gov/sites/dnr/files/vfc/2026/09/main/Airspace%20and%20Permit%20Update%20Presentation%20Slides_0.pdf))

The later-records CSV keeps those reporting periods explicit and does not sum them into a purported current regional total. Missouri’s table omits explicit airspace units, while another chart in the same presentation labels airspace in cubic yards and life in years; the CSV preserves that unit caveat. ([Missouri DNR presentation](https://dnr.mo.gov/sites/dnr/files/vfc/2026/09/main/Airspace%20and%20Permit%20Update%20Presentation%20Slides_0.pdf))

We did not turn remaining-life estimates into scheduled closures, subtract calendar time from the historical regional forecast, or infer changes in filling rates by comparing unlike reporting periods. MARC also contains a final-year inconsistency between its Scenario 2 summary and individual-facility table, which this analysis does not attempt to resolve. ([MARC Tables 3 and 4](https://www.marc.org/document/landfill-capacity-study))

## Permitting context

Missouri’s facility record dates Presidio’s construction permit to May 26, 2026; the agency’s announcement says an operating permit is required before waste acceptance. The Central Missouri project record documents an April 3, 2026 preliminary site investigation approval, not a new operating-capacity authorization. ([Presidio facility record](https://dnr.mo.gov/waste-recycling/sites-regulated-facilities/interest/presidio-environmental-repository); [Presidio announcement](https://dnr.mo.gov/communications/news/department-natural-resources-issues-construction-permit-pettis-county-development-company-llcs-presidio-environmental-repository-facility); [Central Missouri project record](https://dnr.mo.gov/waste-recycling/sites-regulated-facilities/interest/central-missouri-landfill))

This analysis confirmed those milestones, not a Presidio operating permit or a completed Central Missouri expansion. Recheck the agency records when relying on permitting information after this report’s research date.

## Reproduce or cite the work

The package includes three CSV files, a PNG chart, `analyze.py` and `calculation-results.json`. Run `python3 analyze.py` with Python, NumPy and Matplotlib installed to regenerate the datasets, arithmetic and chart.

Suggested credit is “Dump It KC analysis of MARC public records,” accompanied by the original source and the baseline dates. This is original analysis of public information, not exclusive raw data, agency-endorsed research or a new engineering capacity study; no private customer or company disposal records were used.
