Kansas City’s landfill question is not just how much space remains, but where that space sits compared with the waste being deposited. Dump It KC’s analysis of the historical baseline in MARC’s regional study found that three facilities accounted for 67.6% of annual filling but only 39.6% of remaining capacity across the seven existing landfills studied. (MARC, Table 1)

That imbalance offers a more useful starting point than a single regional expiration date. It suggests that changes at heavily used facilities deserve attention well before the entire region exhausts its modeled capacity.

This is a regional research article, not a disposal-site directory. For help with a cleanup, explore our Kansas City dumpster rental and disposal services; for facility-specific planning, use our landfill and transfer-station guide.

The short answer: there is no single closing date

MARC’s January 2024 study modeled between 19.7 and 37.5 years of regional capacity, depending on population, waste generation, expansions, a proposed landfill and additional diversion. Those estimates were measured from December 31, 2022, with modeled final acceptance years ranging from 2042 to 2060; they are not 19.7 to 37.5 years remaining from today. (MARC, Table 3)

Newer state records provide updates for individual facilities, but they do not constitute a single, synchronized replacement for that regional model. Kansas reports figures from its 2023–2024 permit-renewal period, while Missouri’s 2026 presentation includes facility surveys dated in 2025. (KDHE state plan, Table 2-2; Missouri DNR airspace presentation)

The responsible answer therefore has three parts: understand the regional model, examine the distribution of remaining space and track what has actually been surveyed or permitted since then.

Our finding: the 68% versus 40% imbalance

We recalculated each facility’s share of the seven-site baseline in MARC’s Table 1. Johnson County, Courtney Ridge and Central Missouri together accounted for approximately 3.18 million of the 4.70 million cubic yards filled annually, but held only 52.54 million of the 132.80 million cubic yards of remaining space. (Dump It KC calculations from MARC, Table 1)

Seven-landfill chart comparing annual filling shares with remaining capacity shares. Johnson County, Central Missouri and Courtney Ridge combined: 67.6% of annual filling, 39.6% of space. Historical 2020 to 2022 filling and December 31, 2021 capacity.
Original Dump It KC calculations from MARC Table 1. Annual filling: 2020–2022 average. Remaining capacity: December 31, 2021. These are historical shares, not a 2026 survey. The same values are listed in the facility cards.

Johnson County

Share of baseline annual filling
32.3%
Share of baseline remaining capacity
21.4%

Central Missouri

Share of baseline annual filling
17.8%
Share of baseline remaining capacity
6.1%

Courtney Ridge

Share of baseline annual filling
17.5%
Share of baseline remaining capacity
12.1%

HAMM

Share of baseline annual filling
16.1%
Share of baseline remaining capacity
41.0%

St. Joseph

Share of baseline annual filling
6.3%
Share of baseline remaining capacity
6.8%

Rolling Meadows

Share of baseline annual filling
6.1%
Share of baseline remaining capacity
9.7%

Show Me Regional

Share of baseline annual filling
3.9%
Share of baseline remaining capacity
2.9%

These are calculated shares, not percentages printed in the source report, and displayed figures are rounded. Annual filling uses the report’s 2020–2022 average; the remaining-capacity column is labeled December 31, 2021, so this is explicitly a historical comparison, not a measurement of space available in November 2026. (MARC, Table 1 and study assumptions)

HAMM illustrates the other side of the imbalance: it held about 41% of the baseline space while accounting for about 16% of annual filling. The three higher-throughput facilities collectively had a 28.0-percentage-point gap between their share of filling and their share of space. (Dump It KC calculations from MARC, Table 1)

This does not mean those facilities handled 68% of trash generated by Kansas City residents. The report measures facility acceptance, and private landfills can receive waste from outside the region. (MARC study assumptions)

Our interpretation is that regional capacity can look more comfortable in aggregate than the operating picture at particular sites. The comparison identifies where to ask questions; it does not measure hauling costs, prove an imminent shortage or predict a particular facility’s closing date.

Why the order of closures matters

MARC’s population-growth scenario modeled final acceptance years of 2030 for Central Missouri, 2035 for Show Me Regional, 2036 for Courtney Ridge and 2037 for Johnson County. Those four facilities represented 71.5% of baseline annual filling, based on our calculation using the report’s facility data. (MARC, Tables 1 and 4)

That is not a prediction that Kansas City will lose 71.5% of its disposal capacity by 2037. It is a measure of the baseline throughput associated with the facilities that close earlier in one historical scenario, and that scenario redirects their waste to other landfills. (MARC, Tables 1 and 4 and study assumptions)

An important limitation follows: the study did not impose maximum annual acceptance constraints and assumed landfills could be permitted to accept the volume generated for disposal. We therefore would not use its regional endpoint as proof that every rerouted load could be accommodated without operational changes. (MARC study assumptions)

What newer state records tell us

Later records help identify facilities to watch, but their dates and methods matter. The following are reported estimates at their respective reporting periods, not verified countdowns from today.

Central Missouri

Reported remaining life
6.93 years
Survey date
April 18, 2025

Listed among facilities with less than ten years of estimated airspace in the Missouri DNR airspace presentation.

Courtney Ridge

Reported remaining life
19.57 years
Survey date
December 4, 2025

Reported in the Missouri DNR airspace presentation.

Johnson County

Reported remaining life
18 years
Reporting period
2023–2024 permit renewals

Reported in KDHE’s 2026–2030 state plan, Table 2-2.

HAMM

Reported remaining life
53 years
Reporting period
2023–2024 permit renewals

Reported in KDHE’s 2026–2030 state plan, Table 2-2.

Rolling Meadows

Reported remaining life
32 years
Reporting period
2023–2024 permit renewals

Reported in KDHE’s 2026–2030 state plan, Table 2-2.

We have not added these estimates together or converted them into scheduled closures. A facility-life estimate based on recent filling is a different analytical tool from a regional model that redirects waste when another facility closes.

A lined landfill cell and disposal operations at Waimanalo Gulch in Honolulu, Hawaii, photographed in 2003; not a Kansas City facility
A lined landfill cell in Honolulu, Hawaii. Photo: Eric Guinther / Wikimedia Commons, CC BY-SA 3.0 (resized).

The real 2026 news: permitting is moving, but stages matter

Presidio Environmental Repository reached a documented milestone when Missouri DNR issued its construction permit on May 26, 2026. The agency’s announcement explicitly states that an operating permit is required before the facility can accept waste. (Presidio facility record; Missouri DNR announcement)

That distinction prevents a common counting error: a construction permit should not be described as an open landfill. Our review confirmed the construction milestone, not an operating permit or an actual opening date.

The Central Missouri proposal also advanced through a preliminary site investigation approved April 3, 2026, for a property of approximately 71 acres. The state’s project page describes the preliminary investigation separately from the permit-application process; it does not establish new operating disposal capacity. (Central Missouri project record)

For readers following these projects, we recommend tracking construction authorization, operating authorization and the start of waste acceptance separately. Treating them as one milestone makes future capacity look more certain than the records support.

What changes the outlook most?

Instead of comparing the most optimistic and pessimistic scenarios as if they were equally likely outcomes, we compared pairs in which one modeled assumption changes. These calculations show the model’s sensitivity, not guaranteed years that a policy or project will deliver.

  • More waste per person: Adding 1.81% annual per-capita waste growth to the population-growth case reduced modeled life from 23.6 to 19.7 years, a loss of 3.9 years. (MARC, Scenarios 2 and 11)
  • Additional disposal space: Adding 20 million cubic yards of expansion to that population-growth case increased modeled life from 23.6 to 27.4 years, a gain of 3.8 years. (MARC, Scenarios 2 and 4)
  • Additional diversion: With population growth, 20 million cubic yards of expansion and Presidio already assumed, 10% additional diversion added 3.1 years; 20% additional diversion added 6.9 years. (MARC, Scenarios 7, 8 and 9)

The useful lesson is not that diversion and expansion are interchangeable. It is that the amount buried, as well as the amount of space permitted, materially changes this model’s outcome.

What this means for local projects

MARC’s 2026 ReLoop plan identifies construction-material recovery, deconstruction and reuse as regional priorities. That gives contractors and property owners a practical connection to a subject that otherwise sounds like a distant planning issue. (MARC ReLoop material recovery plan)

For an individual project, we recommend starting with specific questions rather than assuming every load can follow the same disposal route:

  • Before demolition: Identify reusable items and confirm an accepting destination before removing or mixing them.
  • Before loading concrete: Check the receiving facility’s rules for clean concrete, rebar and mixed debris using our Kansas City concrete recycling and disposal guide.
  • Before choosing a drop-off: Use our Kansas City landfill and transfer-station guide for site-specific planning, then confirm current acceptance with the facility.
  • Before accepting a diversion claim: Ask where the material went and what documentation supports the claim.

The capacity study is not a dumpster-price forecast. We have not used its figures to predict customer charges or claim that a rental today will become unavailable on a particular future date.

How we did the analysis

Dump It KC transcribed MARC’s seven existing-facility rows, excluded proposed Presidio from that baseline denominator, totaled annual filling and remaining capacity separately, and calculated each facility’s percentage of each total. The 67.6% and 39.6% figures are the combined shares for Johnson County, Courtney Ridge and Central Missouri. (MARC, Table 1)

We separately checked Kansas’ state plan, Missouri’s airspace presentation and the two Missouri permitting records discussed here. We did not blend their different reporting periods into a purported current regional total or subtract elapsed calendar years from the old model to manufacture a new forecast.

This is original analysis of public records, not exclusive raw data, a new engineering capacity study or research endorsed by the agencies cited. No private customer records or company disposal statistics were used.

Our conclusion is straightforward: the best question is not simply “When does Kansas City run out?” It is “Which heavily used facilities face pressure first, what replacement capacity is actually authorized, and how much material can avoid disposal altogether?”

Download the supporting research

Explore the figures, reproduce the calculations or use the chart with its source caption. All files are free to download without a signup; keep the reporting dates and limitations with any figures you cite.

Research report and methodology

Definitions, calculations, source links and limitations in a readable text document.

Download methodology (.md)

Seven-landfill baseline data

Original values, calculated shares and historical reporting dates for all seven facilities.

Download baseline data (.csv)

All eleven MARC scenarios

Each scenario’s assumptions, modeled years and final acceptance year.

Download scenario data (.csv)

Newer state records

Seven facility records with their survey or reporting periods and unit caveats.

Download state records (.csv)

Original comparison chart

High-resolution paired-bar chart, including historical dates and the source caption.

Download chart (.png)

Complete supporting research

The report, three datasets, chart, Python calculation script and machine-readable results.

Download research package (.zip)

Suggested credit: Dump It KC analysis of MARC public records. These are public-source calculations, not exclusive raw measurements or research endorsed by the agencies cited.

More Kansas City waste research

Our Kansas City illegal dumping report examines a different question using city 311 records. You can also browse the Dump It KC resource center for practical project guidance.

About the authors

Dump It KC logo

Dump It KC

Kansas City dumpster rental and junk removal

Locally owned dumpster rental and junk removal for homeowners, contractors and businesses across the Kansas City metro, with flat upfront pricing and same day delivery whenever the schedule allows.

Rodney Liber

Founder, Dump It KC

Rodney Liber founded Dump It KC with Bobbie in 2026 and runs its day-to-day operations, dispatch and customer service across the Kansas City metro, so the advice on this blog comes from the jobs the crew handles every week. Since 2004 he has also led The Turn Group, a Liberty, Missouri web development firm, and he brings more than two decades of building dependable systems to how Dump It KC schedules, prices and delivers.

All articles

Google reviews

What Kansas City Customers Say About Us

  • Google profile photo of Lauren Stern Lauren Stern

    Super easy getting a dumpster scheduled, the gentleman that dropped it off was super helpful and it was incredibly easy to communicatr with them! Was even able to schedule early pick up via text!

  • Google profile photo of Rosemary Barria Rosemary Barria

    I needed a dumpster and they arrived quickly. The whole process was seamless and easy which I appreciate as a busy person. I definitely recommend adding the wheelbarrow. It made things much easier.

  • Google profile photo of Beth McIntire Beth McIntire

    I wish I had a few pictures! Rodney was awesome to work with; responsive, informative and extremely timely! That dumpster arrived as promised and was picked up promptly later the same day! An exceptional local business I gladly support!

  • Google profile photo of G Hernandez G Hernandez

    Ordered to have the dumpster rental on Saturday morning at 1am. They delivered that same day around 130p. Very fast. Very nice guys. Definitely will use again!

  • Google profile photo of Andrew Juarez Andrew Juarez

    Dump It KC responded quickly when I needed a dumpster and were very easy to work with. Highly recommended.

  • Google profile photo of Curtis B Curtis B

    The service was priced fair. Booking was simple. The dumpster was dropped off with no issue and fast. I was explained the process. I will use again if I accumulate another hoard of items in the future.

  • Google profile photo of Eva McDorman Eva McDorman

    Dump it KC delivered our dumpster the same day! We were able to get our barn cleaned out in no time.

  • Google profile photo of Rex Smith Rex Smith

    They dropped off a big dumpster across the street and their truck tore up the front yard of our house with the trucks front tires, rodney and his wife came out and leveled the yard. Added topsoil and seeded it, good people you can trust

  • Google profile photo of Jordan Gray Jordan Gray

    Great friendly service! Easy booking and easy directions to follow. Highly recommend

  • Google profile photo of Maxine Williams Maxine Williams

    Dump It KC Team provided me with Great quality of service. They provided a clean dumpster on time and picked it up on time. I look forward to doing business with them in the future as well. Thank you for all of your support.

  • Google profile photo of Daniel Weber Daniel Weber

    Easy to work with, quick delivery.

  • Google profile photo of Tyre Willis Tyre Willis

    Great service.

Real reviews from our Google Business Profile, shown word for word and updated automatically.

Dump It KC

Plan Your Next Cleanup

Tell us what you are clearing out. We can help you choose a dumpster and check which materials need a separate disposal option.

Call Text Rent Junk